Water Ingress in Long TBM Tunnels
David Lees
The 15km headrace tunnel for the Uma Oya project in Sri Lanka was excavated by double shield TBM and intersected large quantities of water.
Learnings from this project such as better understanding the effects of the tunnel on the hydro-geology of the area, identifying relevant in-tunnel investigation techniques, and developing better pre-excavation and post excavation grouting systems relates to other long hard rock TBM projects.
Delivered by David Lees, the presentation will address why we need to limit the water ingress into tunnels under construction with regards to the potential effect on the environment with dewatering of surface and near surface aquifers, the effect on the construction and its schedule, and the methods available for prediction and control of ground water during tunnel excavation.
Engineers Australia members participating in AGS technical sessions can record attendance on their personal CPD logs. Members should refer to Engineers Australia CPD policy for details on CPD types, requirements and auditing guidelines.